Ostrich Assembly Tip


Ostrich Assembly Tip


Joe Ferebee has created what is the most dynamic system for mounting an Ostrich.

Each component for the Ferebee Ostrich System is sold separately.


Assembly Tip:


It is best to attach the leg rod extensions to the legs, then attach the legs to the body. Attach the neck to the body, then attach the assembly to the base. Once secure, use a sturdy ladder and attach the painted head to the neck.



 

  Go Back